Jump to content

Field House Problems


RatFink

Recommended Posts

It had been speculation and rumor that the contractor that installed the turf

at the Rubber Bowl and now in the field house is in financial difficulties.

Appearantly the contractor has closed done. The turf is on site at the field

house with no one to install it. Work is stopped.

Work in the two outdoors fields is appearantly continuing. It was reported

that the ground is being cleared for side by side grass and turf fields. The

original plans called for two full length practice fields. Just reported was that

the turf portion will only be sixty yards long.

Maybe the university can cut its losses and sell the place to the Suckeyes.

Do the deal, Charlie.

Link to comment
Share on other sites

Guest David Lee Morgan

Hey Rat Fink, thanks for showing up with information I reported in the paper two weeks ago. You must be the only person more uninformed that I am.

Must be hard making the trip up from Eagle country to catch a few kernals of information on Friday.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...